Agridence
    EUDR ready? Take the 15-min check.EUDR Assessment
    Solutions chevron_right Organic group certification

    From unmapped farmers to an audit-ready organic dossier.

    We design and run the Internal Control System, map every farm, train your farmers and prepare the dossier your certification body audits. You keep the digital record afterwards.

    rule_settingsInternal Control System polylineGPS farm polygons fact_checkInternal inspections
    app.agridence.com/programmes/organic
    Plot AGD-0142 2.84 ha · boundary walked 5 plots mapped offline · synced
    Farmer registryICS status
    Farmer 0138 · 2 plotsInspected
    Farmer 0139 · 1 plotRegistered
    Farmer 0140 · 3 plotsCorrective action
    verified_userISO 27001 certified cloud_offOffline field capture in 7 languages handshakePartnered with an international certification body for organic products
    The problem

    Organic group certification is a systems problem, not a paperwork problem.

    No certifier will audit a group without a functioning Internal Control System, a complete farmer registry and mapped plots. Most traders and producer groups have none of the three. Building them in-house costs a season you probably do not have.

    What the certifier needs before an audit
    check_box_outline_blankA functioning Internal Control System
    check_box_outline_blankA complete farmer registry
    check_box_outline_blankEvery plot mapped
    Most groups arrive with none of the three.
    What we do

    We build the system and run it with your group.

    how_to_reg
    Register and screen farmers
    Every farmer entered and checked for eligibility against the standard.
    polyline
    Map every farm
    GPS polygons walked and validated on site, captured offline where there is no signal.
    rule_settings
    Design, set up and run the ICS
    The Internal Control System your certifier expects, written and operating, not just documented.
    school
    Train farmers on the standard
    Training on the standard they will be audited against, in the language they speak.
    fact_check
    Carry out internal inspections
    Inspections run and recorded farm by farm, with findings logged against each farmer.
    build_circle
    Manage corrective actions
    Non-conformities tracked to closure and documented for the auditor.
    handshake
    Coordinate with your certifier
    We work with your certification body through audit preparation and the audit itself.
    What you get

    Five deliverables, handed over to you.

    task_altInternal Control System documentation
    task_altDigital farm maps and GPS polygons
    task_altA complete farmer registry
    task_altInternal inspection reports
    task_altAn audit-ready certification dossier, submitted to your certifier
    Every deliverable is a live digital record, not a folder of scans.
    The part nobody else gives you

    The polygons and farmer records built for your organic audit are the same evidence EUDR asks for.

    Map once. Use the data for certification, then for your deforestation due diligence, without sending a second team to the same farms.

    One field visit
    GPS polygon, farmer record, plot history
    Captured once by the field team, stored as a live digital record you own.
    Polygon Farmer ID Production date
    ecoOrganic certification dossier
    Farmer registry, mapped plots, internal inspections and corrective actions, assembled for your certifier.
    forestEUDR due diligence
    The same plot geolocation and production dates feed deforestation risk assessment and your Due Diligence Statement. See EUDR compliance
    How it works

    Four stages, from scoping to the audit.

    01
    Scope
    Hectares, farmer count, region and target standard. We confirm fit and timelines before you commit.
    02
    Map and register
    Field teams capture polygons and farmer data offline, no connectivity required, syncing when back in range.
    03
    Build and train
    Internal Control System in place, farmers trained on the standard, internal inspections run.
    04
    Hand over
    Dossier submitted to your certification body, corrective actions managed through the audit.
    Who this is for

    Groups that need certified volume, not another pilot.

    local_shipping
    Traders and exporters
    You need certified volume from a supply base that is not yet certified.
    diversity_3
    Producer groups and cooperatives
    You want organic status but have no internal system to get there.
    storefront
    Buyers
    You need a group brought up to standard before you can source from it.
    gavelWhat we do not do

    We are not a certification body.

    Certification decisions rest solely and independently with your certifier. We do not guarantee certification or an audit outcome. What we do is make sure you arrive at the audit prepared.

    FAQ

    Questions we get before scoping.

    Which standards do you work on?expand_more

    Organic standards today. Tell us the scheme and region and we will confirm fit before you commit.

    How long does a programme take?expand_more

    It depends on hectares, farmer numbers and travel time between farms. We scope timelines at the start, not after we arrive.

    Do you work where our farmers are?expand_more

    West Africa and Southeast Asia today. Our field app runs offline in English, French, Indonesian, Thai, Khmer, Malay and Chinese.

    What happens to the data afterwards?expand_more

    The farm maps and farmer registry are yours to use for your certification and compliance reporting.

    Tell us your hectares, your farmer count and the standard you are working towards.

    We will come back with a scoped programme.